Rulemakings & Workshops
PSC Rules Tracking Report
Compliance With Federal Environmental Regulations
The Commission wants to determine the potential impact on Missouri's electric utilities' electric generation plants of current and future EPA rules under the Clean Air and Clean Water Acts. Case No. EW-2012-0065
Renewable Energy Standard Law
The Commission’s renewable energy standards rules (4 CSR 240-20.100 and 4 CSR 240-3.156) have been in effect for approximately 6 months. The Commission wishes to draw on the experience gained regarding the operation of those rules to consider ways in which the rules might be improved. Case No.
EW-2012-0255
Missouri Energy Efficiency Investment Act
This rulemaking is required with the passage of SB 376. The docket is EW-2011-0372
Working Docket--TW-2010-0362
A Repository Docket to Gather Information and Assess the Availability of Broadband Services in the State of Missouri. The Missouri Public Service Commission has received a letter from the State Senate's Committee on Commerce, Consumer Protection, Energy and the Environment. Among other matters, the Committee is requesting the Missouri PSC review the FCC's National Broadband Plan, and to assess the current level of high-speed Internet access in Missouri. Working Docket
Call Routing and Call Completion Problems
Case No. TW-2012-0112
Pipeline Safety Regulations
A rulemaking case to consider proposed revisions to the Commission's pipeline safety regulations. Case No. GX-2013-0092
Joint Committee On Administrative Rules (JCAR)