Virtual Local Public Hearing EA 2026 0154 Evergy Metro (Hearing)

 

In the Matter of the Application of Evergy Metro, Inc., d/b/a Evergy Missouri Metro for Permission and Approval of a Certificate of Convenience and Necessity Authorizing It to Construct, Install, Own, Operate, Manage, Maintain, and Control a Natural Gas Electrical Production Facility

Related Submission(s)
Recorded On: 9/10/2026 6:30 PM